Home > FAQ > About the after-service. >

The maintenance of the conveyors

The maintenance of the conveyors
Update Time:2017-05-18
The maintenance schedule for any conveyors can be divided into three stages:
1.Belt shut down and empty
2.Belt running empty
3.Belt running loaded

CHAISHANG lists the following work items under the conveyor maintenance plan:

❶Check/lubricate all bearings, universal joints, and pulleys
❷Check chain tension, wear and lubricate
❸Check sprocket alignment, wear, and screw set
❹Check flat belt tension, wear and lacing
❺Check V-belt tension, wear and sheave alignment
❻Check electrical connections at conveyor
❼Check gearbox and fill to proper level
❽Check general condition of system
Operate entire system after serviceList any items requiring replacement or repair
Clinker downhill Pipe Conveyor at Tadipatri